Please use this identifier to cite or link to this item: https://hdl.handle.net/10419/157747 
Year of Publication: 
2016
Citation: 
[Journal:] Logistics Research [ISSN:] 1865-0368 [Volume:] 9 [Issue:] 1 [Publisher:] Springer [Place:] Heidelberg [Year:] 2016 [Pages:] 1-23
Publisher: 
Springer, Heidelberg
Abstract: 
In this work the influence of production and capacity planning on decisions regarding facility location, distribution quantities and component remanufacturing (and vice versa) in a closed-loop supply chain network (CLSCN) with multiple make-to-order products is studied. A mathematical model, the facility location, capacity and aggregate production planning with remanufacturing (FLCAPPR) model, for designing the CLSCN, for planning capacities at the facilities and for structuring the production and distribution system of the network cost-optimally, is formulated. It consists of a facility location model with component remanufacturing over multiple time periods, which is extended by capacity and production planning on an aggregate level. The problem is solved for an example set of data which is based on previous CLSC research in the copier industry. In a numerical study the effect of the extended planning approach on the decision to process returned products is determined. Furthermore, the FLCAPPR model is solved for different returned product quantities and numbers of periods in the planning horizon to study the influence on the network design and on the procuring, production and distribution quantities. It turns out that decisions regarding the locations of and the capacity equipment at facilities and decisions regarding the production and distribution system are interdependent; therefore, they have to be managed jointly. Furthermore, it is shown that the decision to process returned products and use remanufactured components in the production does depend not only on the costs, but also on the quantity of returned products and the length of the planning horizon.
Subjects: 
Closed-loop supply chain management
Network design
Remanufacturing
Reverse logistics
Aggregate production planning
Capacity planning
Persistent Identifier of the first edition: 
Creative Commons License: 
cc-by Logo
Document Type: 
Article

Files in This Item:
File
Size





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.