Počet záznamů: 1  

Free Discharge of Subsurface Drainage Effluent: An Alternate Design of the Surface Drain System in Pakistan

  1. 1.
    0542348 - ÚI 2022 RIV CH eng J - Článek v odborném periodiku
    Imran, M. A. - Xu, J. - Sultan, M. - Shamshiri, R. R. - Ahmed, N. - Javed, Q. - Asfahan, H. M. - Latif, Yasir - Usman, M. - Ahmad, R.
    Free Discharge of Subsurface Drainage Effluent: An Alternate Design of the Surface Drain System in Pakistan.
    Sustainability. Roč. 13, č. 7 (2021), č. článku 4080. E-ISSN 2071-1050
    Institucionální podpora: RVO:67985807
    Klíčová slova: surface drain system * design * drainage effluent * Pakistan
    Obor OECD: Hydrology
    Impakt faktor: 3.889, rok: 2021
    Způsob publikování: Open access

    In Pakistan, many subsurface (SS) drainage projects were launched by the Salinity Control and Reclamation Project (SCARP) to deal with twin problems (waterlogging and salinity). In some cases, sump pumps were installed for the disposal of SS effluent into surface drainage channels. Presently, sump pumps have become dysfunctional due to social and financial constraints. This study evaluates the alternate design of the Paharang drainage system that could permit the discharge of the SS drainage system in the response of gravity. The proposed design was completed after many successive trials in terms of lowering the bed level and decreasing the channel bed slope. Interconnected MS-Excel worksheets were developed to design the L-section and X-section. Design continuity of the drainage system was achieved by ensuring the bed and water levels of the receiving drain were lower than the outfalling drain. The drain cross-section was set within the present row with a few changes on the service roadside. The channel side slope was taken as 1:1.5 and the spoil bank inner and outer slopes were kept as 1:2 for the entire design. The earthwork was calculated in terms of excavation for lowering the bed level and increasing the drain section to place the excavated materials in a specific manner. The study showed that modification in the design of the Paharang drainage system is technically admissible and allows for the continuous discharge of SS drainage effluent from the area.
    Trvalý link: http://hdl.handle.net/11104/0319778

     
    Název souboruStaženoVelikostKomentářVerzePřístup
    0542348a-aoa.pdf14.9 MBOA CC BY 4.0Vydavatelský postprintpovolen
     
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.