The Ciciriello catchment is a 3 km2 drainage sub-basin of the Bussento river basin, located in the southern part of the Campania Region (Southern Italy). Since 2012, this catchment has been studied using an interdisciplinary approach—geomorphological, hydrogeological, and hydrological— and a hydro-chemical monitoring system. Following previous research, the aim of this paper is to calibrate, on this catchment, the hydrologic parameters for a water budget at event time-scales using the HEC-HMS model, adopting object-based hydro-geomorphological class features. Firstly, lumped modeling was performed to calibrate the hydrologic parameters from 20 observed hydrographs at the downstream monitoring station of the Ciciriello catchment. Then, physical-based rainfall–runoff modeling was conducted using three different procedures: (1) applying the recession coefficients to each outlet with a newly defined hydro-geomorphologic index (HGmI); (2) assessing the storage coefficient for each sub-basin as a weighted mean of HGmI; and (3) using the storage coefficient associated with the largest HGmI in the sub-basin. The adopted procedures were tested using diverse goodness-of-fit indices, resulting in good performance when the object-based hydro-geomorphotypes were used for the parameter calibration. The adopted procedure can thus contribute to improvements in rainfall–runoff and water budget modeling in similar ungauged catchments in Mediterranean, hilly, and forested landscapes.

Hydro-Geomorphologic-Based Water Budget at Event Time-Scale in A Mediterranean Headwater Catchment (Southern Italy)

Albina Cuomo
;
Domenico Guida
2021-01-01

Abstract

The Ciciriello catchment is a 3 km2 drainage sub-basin of the Bussento river basin, located in the southern part of the Campania Region (Southern Italy). Since 2012, this catchment has been studied using an interdisciplinary approach—geomorphological, hydrogeological, and hydrological— and a hydro-chemical monitoring system. Following previous research, the aim of this paper is to calibrate, on this catchment, the hydrologic parameters for a water budget at event time-scales using the HEC-HMS model, adopting object-based hydro-geomorphological class features. Firstly, lumped modeling was performed to calibrate the hydrologic parameters from 20 observed hydrographs at the downstream monitoring station of the Ciciriello catchment. Then, physical-based rainfall–runoff modeling was conducted using three different procedures: (1) applying the recession coefficients to each outlet with a newly defined hydro-geomorphologic index (HGmI); (2) assessing the storage coefficient for each sub-basin as a weighted mean of HGmI; and (3) using the storage coefficient associated with the largest HGmI in the sub-basin. The adopted procedures were tested using diverse goodness-of-fit indices, resulting in good performance when the object-based hydro-geomorphotypes were used for the parameter calibration. The adopted procedure can thus contribute to improvements in rainfall–runoff and water budget modeling in similar ungauged catchments in Mediterranean, hilly, and forested landscapes.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11386/4758249
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 6
  • ???jsp.display-item.citation.isi??? 6
social impact