The expectation of a higher level of safety in clearly declared in the Italian acts for rail cases where are indicated the quantitative values to be achieved as well as criteria and procedure for demonstrating the above results. The risk-based approach in the context of safety management offers the opportunity to get a transparent and consistent approach to decision-making about risks. Here below are defined the Risk Indicators to be used in Italy, according the government act (2005) on “Safety in rail tunnels”. Individual Risk Indicators IR = Individual Risk (Probability to be “victim” in a “fatal” accident occurred in a specific tunnel in a year) IR(x) = Point Individual Risk (Probability to be “victim” in a “fatal” accident occurred in a specific point x of a tunnel in a year). Societal Risk BCR = Back Cumulated Risk Distribution so called FN curve (Probability P(N≥Nt) /Year-Tunnel)

L’Analisi di Rischio nelle gallerie ferroviarie. Basi etiche e sociali dei criteri di accettabilità / M., Guarascio; Lombardi, Mara; Rossi, Giuliano. - STAMPA. - 231:(2009), pp. 81-89. (Intervento presentato al convegno SICUREZZA ED ESERCIZIO FERROVIARIO tenutosi a roma nel marzo 2009).

L’Analisi di Rischio nelle gallerie ferroviarie. Basi etiche e sociali dei criteri di accettabilità

LOMBARDI, MARA;Rossi, Giuliano
2009

Abstract

The expectation of a higher level of safety in clearly declared in the Italian acts for rail cases where are indicated the quantitative values to be achieved as well as criteria and procedure for demonstrating the above results. The risk-based approach in the context of safety management offers the opportunity to get a transparent and consistent approach to decision-making about risks. Here below are defined the Risk Indicators to be used in Italy, according the government act (2005) on “Safety in rail tunnels”. Individual Risk Indicators IR = Individual Risk (Probability to be “victim” in a “fatal” accident occurred in a specific tunnel in a year) IR(x) = Point Individual Risk (Probability to be “victim” in a “fatal” accident occurred in a specific point x of a tunnel in a year). Societal Risk BCR = Back Cumulated Risk Distribution so called FN curve (Probability P(N≥Nt) /Year-Tunnel)
2009
SICUREZZA ED ESERCIZIO FERROVIARIO
04 Pubblicazione in atti di convegno::04b Atto di convegno in volume
L’Analisi di Rischio nelle gallerie ferroviarie. Basi etiche e sociali dei criteri di accettabilità / M., Guarascio; Lombardi, Mara; Rossi, Giuliano. - STAMPA. - 231:(2009), pp. 81-89. (Intervento presentato al convegno SICUREZZA ED ESERCIZIO FERROVIARIO tenutosi a roma nel marzo 2009).
File allegati a questo prodotto
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11573/56808
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact