Abstract:
Proposes to upgrade the drinking water drainage system to the only operating hand pump within the recreation site. Project would bring the pump into compliance by replacing the existing 20-foot drain pipe with the required 100-foot pipe, ending west of campsite 4. Work would include digging a ditch for the new pipe with a ditch digger within a bushy area while the camp is closed.
Description:
3 pp.
This site is located approximately 40 miles west of Eugene, Oregon, in Township 18 South, Range 8 West, Section 21.
Captured July 13, 2007.