Abstract
The control of the lead risk among shipbreakers
presents problems of great practical
difficulty. Measures for the prevention of plumbism
applied successfully in other industries are here impracticable,
with the result that the breaking-up of
a heavily leaded ship is almost invariably responsible
for a considerable crop of gross cases of lead poisoning
and a large mass of ill-health stopping just short of
incapacity for work.