NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Automated array assemblyManufacturing techniques are evaluated using expenses based on experience and studying basic cost factors for each step to evaluate expenses from a first-principles point of view. A formal cost accounting procedure is developed which is used throughout the study for cost comparisons. The first test of this procedure is a comparison of its predicted costs for array module manufacturing with costs from a study which is based on experience factors. A manufacturing cost estimate for array modules of $10/W is based on present-day manufacturing techniques, expenses, and materials costs.
Document ID
19760020578
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Williams, B. F.
(RCA Labs. Princeton, NJ, United States)
Date Acquired
September 3, 2013
Publication Date
March 1, 1976
Subject Category
Energy Production And Conversion
Report/Patent Number
NASA-CR-148162
ERDA/JPL-954352-76/1
QR-1
PRRL-76-CR-18
Accession Number
76N27666
Funding Number(s)
CONTRACT_GRANT: JPL-954352
CONTRACT_GRANT: NAS7-100
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available