NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Thermal verification testing of commercial printed-circuit boards for spaceflightA method is discussed developed to verify commercial printed-circuit boards for a shuttle orbital flight. The Space Acceleration Measurement System Project used this method first with great success. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Then temperature definition tests are performed that consist of infrared scanning, thermal vacuum testing, and preliminary thermal operational testing. Only the engineering unit is used for temperature definition testing, but the preliminary thermal operational testing is performed on the flight unit after the temperature range has been defined. In the sequence of testing, vibration testing is performed next, but most vibration failures cannot be detected without subsequent temperature cycling. Finally, final assembly testing is performed to simulate the shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 hours of trouble-free operation. Verification is successful when all components and final assemblies have passed each test satisfactory. This method was very successful in verifying that commercial printed-circuit boards will survive in the shuttle environment.
Document ID
19920002003
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Foster, William M., II
(NASA Lewis Research Center Cleveland, OH, United States)
Date Acquired
September 6, 2013
Publication Date
January 1, 1991
Subject Category
Engineering (General)
Report/Patent Number
NASA-TM-105261
E-6593
NAS 1.15:105261
Meeting Information
Meeting: 1992 Annual Reliability and Maintainability Symposium
Location: Las Vegas, NV
Country: United States
Start Date: January 21, 1991
End Date: January 23, 1991
Sponsors: IEEE
Accession Number
92N11221
Funding Number(s)
PROJECT: RTOP 694-03-OH
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available