NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Galileo spacecraft anomaly and safing recoveryA high-level anomaly recovery plan which identifies the steps necessary to recover from a spacecraft 'Safing' incident was developed for the Galileo spacecraft prior to launch. Since launch, a total of four in-flight anomalies have lead to entry into a system fault protection 'Safing' routine which has required the Galileo flight team to refine and execute the recovery plan. These failures have allowed the flight team to develop an efficient recovery process when permanent spacecraft capability degradation is minimal and the cause of the anomaly is quickly diagnosed. With this previous recovery experience and the very focused boundary conditions of a specific potential failure, a Gaspra asteroid recovery plan was designed to be implemented in as quickly as forty hours (desired goal). This paper documents the work performed above, however, the Galileo project remains challenged to develop a generic detailed recovery plan which can be implemented in a relatively short time to configure the spacecraft to a nominal state prior to future high priority mission objectives.
Document ID
19940019391
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Basilio, Ralph R.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Durham, David M.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
September 6, 2013
Publication Date
March 1, 1993
Publication Information
Publication: SpaceOps 1992: Proceedings of the Second International Symposium on Ground Data Systems for Space Mission Operations
Subject Category
Spacecraft Design, Testing And Performance
Accession Number
94N23864
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available