NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
EOS Contract Report: The ASTER and MODIS ProjectsThree major tasks occupied the group's efforts during this six months. The first was measuring the bidirectional reflectance properties of four reflectance samples provided by NIST. S. Biggar and P. Spyak made these measurements in both the VNIR and SWIR. The second major task was the group's move to a new facility in March. This required that our calibration laboratory and blacklab be disassembled and reassembled in addition to moving offices and other equipment. The third task was the joint vicarious calibration that took place the latter half of June. This campaign included two weeks of laboratory measurements by the RSG and nine days in the field. Other work during the past six months consisted of Science Team support activities including the attendance at meetings related to MODIS and ASTER. In addition, K. Scott continued work on the cross-calibration software package by developing a graphical interface to 6S, an uncertainty analysis code, and an image registration module. M. Sicard used a trip to Cimel in France to change the Cimel TIR radiometer's field of view and then characterized this new field of view. Z. Rouf and Z. Murshalin processed radiance-based data from last summer's Lunar Lake campaign.
Document ID
19970023469
Acquisition Source
Goddard Space Flight Center
Document Type
Contractor Report (CR)
Authors
Slater, P.
(Arizona Univ. Tucson, AZ United States)
Thome, K.
(Arizona Univ. Tucson, AZ United States)
Date Acquired
September 6, 2013
Publication Date
June 30, 1997
Subject Category
Optics
Report/Patent Number
NAS 1.26:205013
Rept-66
NASA-CR-205013
Accession Number
97N23797
Funding Number(s)
CONTRACT_GRANT: NAS5-31717
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available