NASA-USRP Summer 2013 Internship Final ReportThree major projects were undertaken during the Summer 2013 USRP Internship: (A) assisting the cTAPS group with component and pressure vessel system analyses and documentation, (B) designing a hoisting fixture for a solid rocket motor, (C) finding an alternative to removing the DOT rated gaseous nitrogen tank from the roof for hydrostatic testing. Hypergolic Material Assessments (HMAs) and pressure calculations were performed on components of pressure systems. Additionally, component information was logged in the Standard Parts Database to provide a location where system designers can find information regarding components, including their specifications and compatibility with fluids. A hoisting fixture was designed to hoist a solid rocket motor and meets the specifications related to stress and size. However, there are issues with the fixtures bolt head allotment, the bolt spacing, and the complexity of the part. Finally, calculations were performed on an expiring DOT rated gaseous nitrogen tank in an attempt to re-rate it per ASME standards. This was unsuccessful so other options are being explored for the tank. While much progress was made on all three projects, there is still work to be performed on each project to achieve the desired results.
Document ID
20140010562
Acquisition Source
Johnson Space Center
Document Type
Other
Authors
Gurganus, S. Christine
(East Carolina Univ. Greenville, NC, United States)
Date Acquired
August 12, 2014
Publication Date
June 1, 2013
Subject Category
Fluid Mechanics And Thermodynamics
Report/Patent Number
JSC-29375
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available