NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
ExMC Work Prioritization ProcessLast year, NASA's Human Research Program (HRP) introduced the concept of a "Path to Risk Reduction" (PRR), which will provide a roadmap that shows how the work being done within each HRP element can be mapped to reducing or closing exploration risks. Efforts are currently underway within the Exploration Medical Capability (ExMC) Element to develop a structured, repeatable process for prioritizing work utilizing decision analysis techniques and risk estimation tools. The goal of this effort is to ensure that the work done within the element maximizes risk reduction for future exploration missions in a quantifiable way and better aligns with the intent and content of the Path to Risk Reduction. The Integrated Medical Model (IMM) will be used to identify those conditions that are major contributors of medical risk for a given design reference mission. For each of these conditions, potential prevention, screening, diagnosis, and treatment methods will be identified. ExMC will then aim to prioritize its potential investments in these mitigation methods based upon their potential for risk reduction and other factors such as vehicle performance impacts, near term schedule needs, duplication with external efforts, and cost. This presentation will describe the process developed to perform this prioritization and inform investment discussions in future element planning efforts. It will also provide an overview of the required input information, types of process participants, figures of merit, and the expected outputs of the process.
Document ID
20160006866
Acquisition Source
Langley Research Center
Document Type
Conference Paper
Authors
Simon, Matthew
(NASA Langley Research Center Hampton, VA, United States)
Date Acquired
June 1, 2016
Publication Date
January 13, 2015
Subject Category
Systems Analysis And Operations Research
Report/Patent Number
NF1676L-19948
Meeting Information
Meeting: NASA Human Research Program Investigators'' Workshop
Location: Galveston, TX
Country: United States
Start Date: January 13, 2015
End Date: January 15, 2015
Sponsors: NASA Headquarters
Funding Number(s)
WBS: WBS 444543.01.07.10
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available