NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Mars Surface Operations via Low-Latency Telerobotics from PhobosTo help assess the feasibility and timing of Low-Latency Telerobotics (LLT) operations on Mars via a Phobos telecommand base, operations concepts (ops cons) and timelines for several representative sequences for Mars surface operations have been developed. A summary of these LLT sequences and timelines will be presented, along with associated assumptions, operational considerations, and challenges.




Document ID
20160009226
Acquisition Source
Goddard Space Flight Center
Document Type
Presentation
Authors
Wright, Michael
(NASA Goddard Space Flight Center Greenbelt, MD United States)
Lupisella, Mark
(NASA Goddard Space Flight Center Greenbelt, MD United States)
Date Acquired
July 20, 2016
Publication Date
July 19, 2016
Subject Category
Space Sciences (General)
Report/Patent Number
GSFC-E-DAA-TN33806
Meeting Information
Meeting: International Conference on the Exploration of Phobos and Deimos
Location: Moffett Field, CA
Country: United States
Start Date: July 18, 2016
End Date: July 19, 2016
Sponsors: NASA Ames Research Center
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
Keywords
telerobotics
Phobos
exploration
No Preview Available