Assessment of Delivery Accuracy in an Operational-Like EnvironmentIn order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.
Document ID
20180000901
Acquisition Source
Ames Research Center
Document Type
Conference Paper
Authors
Sharma, Shivanjli
(NASA Ames Research Center Moffett Field, CA, United States)
Wynnyk, Mitch
(Mitre Corp. McLean, VA, United States)
Date Acquired
February 5, 2018
Publication Date
June 13, 2016
Subject Category
Air Transportation And Safety
Report/Patent Number
AIAA Paper 2016-4218
ARC-E-DAA-TN28044
Meeting Information
Meeting: AIAA Aviation Technology, Integration, and Operations Conference
Location: Washington, DC
Country: United States
Start Date: June 13, 2016
End Date: June 17, 2016
Sponsors: American Inst. of Aeronautics and Astronautics
Funding Number(s)
WBS: WBS 330693.04.10.01.08
Distribution Limits
Public
Copyright
Public Use Permitted.
Keywords
Air Traffic Scheduling
No Preview Available