The antecedents of construction project change: an analysis of design and build procurement application
journal contribution
posted on 2021-01-01, 00:00 authored by J Smith, D J Edwards, Igor MartekIgor Martek, N Chileshe, S Hayhow, C J RobertsPurpose
This study aims to excoriate, define and delineate the main drivers of “change” in commercial construction projects and generate guidelines on how to minimise exposure to the associated adverse effects upon project stakeholders.
Design/methodology/approach
The research adopts mixed doctrines through a combination of epistemological lenses, embracing two primary philosophical stances: interpretivism, to identify the primary drivers of change based on a systematic literature review and a post-positivist, inductive approach to analyse the results of change within a Joint Contracts Tribunal (JCT) Design and Build (D&B) construction project case study.
Findings
The causal nexus of change during the construction phase is assessed and delineated; the key affecting factors are thematically grouped under headings: extent and severity; time in relation to implementing; instigating party; individual(s) responsible for managing the change; reason for the change; available resource; recoverable or non-recoverable; contract/project type; and type of client. Following this, the effects of change on key elements of the project are encapsulated and recommendations for adaptations which may provide improved experiences are offered.
Originality/value
The study tackles the common issue of managing the deleterious effects of change on commercial construction projects, defining management techniques to minimise stakeholder tribulation.
This study aims to excoriate, define and delineate the main drivers of “change” in commercial construction projects and generate guidelines on how to minimise exposure to the associated adverse effects upon project stakeholders.
Design/methodology/approach
The research adopts mixed doctrines through a combination of epistemological lenses, embracing two primary philosophical stances: interpretivism, to identify the primary drivers of change based on a systematic literature review and a post-positivist, inductive approach to analyse the results of change within a Joint Contracts Tribunal (JCT) Design and Build (D&B) construction project case study.
Findings
The causal nexus of change during the construction phase is assessed and delineated; the key affecting factors are thematically grouped under headings: extent and severity; time in relation to implementing; instigating party; individual(s) responsible for managing the change; reason for the change; available resource; recoverable or non-recoverable; contract/project type; and type of client. Following this, the effects of change on key elements of the project are encapsulated and recommendations for adaptations which may provide improved experiences are offered.
Originality/value
The study tackles the common issue of managing the deleterious effects of change on commercial construction projects, defining management techniques to minimise stakeholder tribulation.
History
Journal
Journal of Engineering, Design and TechnologyPagination
1 - 35Publisher
Emerald PublishingLocation
Bingley, Eng.Publisher DOI
ISSN
1726-0531Language
engNotes
In PressPublication classification
C1 Refereed article in a scholarly journalUsage metrics
Categories
No categories selectedKeywords
Licence
Exports
RefWorks
BibTeX
Ref. manager
Endnote
DataCite
NLM
DC