This study deals with four location problems. The first problem is a brand new location problem on a line and considers the location decisions for depots and quarries in a highway construction project. We develop optimal solution properties of the problem. Using these properties, a dynamic programming algorithm is proposed. The second problem is also a brand new dynamic location problem on a line and locates concrete batching mobile and immobile facilities for a railroad construction project. We develop two mixed integer models to solve the problem. For solving large size problems, we propose a heuristic. Performances of models and the heuristic are tested on randomly generated instances plus a case study data and results are presented. The third problem is a generalization of the second problem to network locations. It is a dynamic version of the well known p-median problem and incorporates mobile facilities. The problem is to locate predetermined number of mobile and immobile facilities over a planning horizon such that sum of facility movement and allocation costs is minimized. Three constructive heuristics and a branch-and-price algorithm are proposed. Performances of these solution procedures are tested on randomly generated instances and results are presented. In the fourth problem we consider a special case of the third problem, allowing only conventional facilities. The algorithm for the third problem is improved so that generating columns and solving a mixed integer model are used repetitively. Performance of the algorithm is tested on randomly generated instances and results are presented

Suggestions

Operational fixed job scheduling problem under spread time constraints: a branch-and-price algorithm
Solyali, O.; Ozpeynirci, O. (Informa UK Limited, 2009-01-01)
This study addresses the operational fixed job scheduling problem under spread time constraints. The problem is to select a subset of jobs having fixed ready times and deadlines for processing on identical parallel machines such that total weight of the selected jobs is maximised. We first give a mathematical formulation of the problem and then reformulate it using Dantzig-Wolfe decomposition. We propose a branch-and-price algorithm that works on the reformulation of the problem. Computational results show ...
Spread time considerations in operational fixed job scheduling
Eliiyi, D. T.; Azizoğlu, Meral (Informa UK Limited, 2006-10-15)
In this study, we consider the operational fixed job scheduling problem on identical parallel machines. We assume that the jobs have fixed ready times and deadlines, and spread time constraints are imposed on machines. Our objective is to select a set of jobs for processing so as to maximise the total weight. We show that the problem is strongly NP-hard, and we investigate several special polynomially solvable cases. We propose a branch and bound algorithm that employs size reduction mechanisms, dominance c...
The multi-resource agent bottleneck generalised assignment problem
Karsu, Ozlem; Azizoğlu, Meral (Informa UK Limited, 2012-01-01)
In this study, we consider the multi resource agent bottleneck generalised assignment problem. Our aim is to minimise the maximum load over all agents. We take our motivation from an assignment problem faced in heating, ventilating and air conditioning sector. We study the linear programming (LP) relaxation of the problem. We use the optimal LP relaxation solutions in our branch and bound algorithm while defining bounding and branching schemes. We find that our branch and bound algorithm returns optimal sol...
Parallel-machine rescheduling with machine disruptions
Azizoğlu, Meral (Informa UK Limited, 2005-12-01)
In this study we consider a rescheduling problem on identical parallel machines. The rescheduling is undertaken because of a period of unavailability on one of the machines. We consider the total flow time as an efficiency measure and stability is gauged in terms of the number of jobs processed on different machines in the original and new schedules. We show that all efficient schedules with respect to efficiency and stability measures can be generated in polynomial time.
Working time constraints in operational fixed job scheduling
Eliiyi, Deniz Tuersel; Azizoğlu, Meral (Informa UK Limited, 2010-01-01)
In this study we consider the operational fixed job scheduling problem under working time limitations. The problem has several practical implications in both production and service operations; however the relevant research is scarce. We analyse pre-emptive and non pre-emptive versions of the problem and its special cases. We provide polynomial-time algorithms for some special cases. We show that the non pre-emptive jobs problem is strongly NP-hard, and propose a branch-and-bound algorithm that employs effic...