Resource Leveling in Construction Projects with Activity Splitting and Resource Constraints: A Simulated Annealing Optimization
Date accepted:
9-Jul-2018
Publisher version:
https://www.nrcresearchpress.com/doi/abs/10.1139/cjce-2017-0670
Journal:
Canadian Journal of Civil Engineering
ISSN:
0315-1468
Publisher:
NRC Research Press (a division of Canadian Science Publishing)
Note:
The accepted manuscript in pdf format is listed with the files at the bottom of this page. The presentation of the authors' names and (or) special characters in the title of the manuscript may differ slightly between what is listed on this page and what is listed in the pdf file of the accepted manuscript; that in the pdf file of the accepted manuscript is what was submitted by the author.
Files
File | Size | Format | View File |
---|---|---|---|
cjce-2017-0670.pdf | 284.37 kB | Adobe PDF | View |
Items in TSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
link to htmlmap