Title: A Hybrid Algorithm for Solving Resource-Constrained Project Scheduling Problems with Fuzzy Activity Durations: An Application in Disc Mower Manufacturing Project
Authors: Kökçam, Abdullah Hulusi
Engin, Orhan
Keywords: Resource-constrained project scheduling
disc mower manufacturing project
fuzzy numbers
hybrid parallel kangaroo algorithm
project delay risk
minimum satisfaction values
Implementation
Time
Publisher: Old City Publishing Inc
Abstract: Determining the resource requirements and the duration of activities are crucial points in project scheduling. Completing a project on planned time heavily depends on the activity durations and resources, which should be determined as accurately and precisely as possible. A Hybrid parallel kangaroo algorithm (HPKA) is developed to cope with this problem and prepare more realistic project schedules that could be executed in time with the minimum risk of being late. The objective is to find a schedule that minimizes schedule risk and maximizes the minimum satisfaction degrees of all activities. The proposed hybrid algorithm is tested with the benchmark problems from the literature. The proposed HPKA is then used to solve a disc mower manufacturing project scheduling problem of a real-world company that manufactures agricultural machinery. The results indicate that the proposed hybrid algorithm can achieve good results for these problems.
URI: https://hdl.handle.net/20.500.13091/3687
ISSN: 1542-3980
1542-3999
Appears in Collections:WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collections

Show full item record



CORE Recommender

Page view(s)

90
checked on Apr 15, 2024

Google ScholarTM

Check





Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.