TUHH Open Research
Help
  • Log In
    New user? Click here to register.Have you forgotten your password?
  • English
  • Deutsch
  • Communities & Collections
  • Publications
  • Research Data
  • People
  • Institutions
  • Projects
  • Statistics
  1. Home
  2. TUHH
  3. Publication References
  4. Scheduling of different automated yard crane systems at container terminals
 
Options

Scheduling of different automated yard crane systems at container terminals

Publikationstyp
Journal Article
Date Issued
2016-09-26
Sprache
English
Author(s)
Speer, Ulf  
Fischer, Kathrin  orcid-logo
Institut
Quantitative Unternehmensforschung und Wirtschaftsinformatik W-4  
TORE-URI
http://hdl.handle.net/11420/4620
Journal
Transportation science  
Volume
51
Issue
1
Start Page
305
End Page
324
Citation
Transportation Science 1 (51): 305-324 (2017)
Publisher DOI
10.1287/trsc.2016.0687
Scopus ID
2-s2.0-85016404760
Publisher
INFORMS
In this work, different variants of a branch-and-bound procedure for yard crane scheduling at seaport container terminals and their effect on the terminal's performance are studied. In particular, this work investigates the level of detail needed to take the exact crane characteristics, e.g., movements and crane interference, into account in the scheduling algorithm. This is examined for four different automated yard crane systems with one or more cranes that operate on rectangular yard blocks with transfer positions at both ends of the block and with the yard blocks arranged orthogonally to the quay. Using a simulation model with realistic scenario data and an automated guided vehicles system for horizontal transport, the results are compared with respect to different key performance indicators, e.g., yard crane productivity and average lateness of jobs. It turns out that especially the consideration of crane interference leads to significant improvements in yard crane productivity. As a result of the long computation times for some crane systems that render the practical application of the algorithm difficult, an approximation procedure is also developed that generates good results in reasonable time and hence allows for real-time application at a container terminal.
Subjects
branch-and-bound
container terminal
RMG
scheduling
yard crane
DDC Class
330: Wirtschaft
TUHH
Weiterführende Links
  • Contact
  • Send Feedback
  • Cookie settings
  • Privacy policy
  • Impress
DSpace Software

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science
Design by effective webwork GmbH

  • Deutsche NationalbibliothekDeutsche Nationalbibliothek
  • ORCiD Member OrganizationORCiD Member Organization
  • DataCiteDataCite
  • Re3DataRe3Data
  • OpenDOAROpenDOAR
  • OpenAireOpenAire
  • BASE Bielefeld Academic Search EngineBASE Bielefeld Academic Search Engine
Feedback