Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/33571
Title: | Incoming inspection Report of the NI-DPU/DCU PFM | Authors: | Salatti, Mario Latini, Valentina Ducret, Franck Maciaszek, Thierry Dusini, Stefano AURICCHIO, NATALIA |
Issue Date: | 2019 | Number: | EUCL-LAM-RP-7-096 | Abstract: | The purpose of this report is to provide the results of the incoming inspection performed on the DPU/DCU PFM (FM01) delivered by OHB-I, after shipping to the LAM laboratory on 8 July 2019. The inspection report contains the status of the unit after inspection and some pictures of the unpacking and the visual inspection | URI: | http://hdl.handle.net/20.500.12386/33571 | Fulltext: | reserved |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | Existing users please |
---|---|---|---|---|
EUCL-LAM-RP-7-096_10_DPU PFM incoming inspection report_Iss1-signed.pdf | [Administrators only] | 2.53 MB | Adobe PDF |
Page view(s)
24
checked on May 13, 2024
Download(s)
1
checked on May 13, 2024
Google ScholarTM
Check
Items in DSpace are published in Open Access, unless otherwise indicated.