Budget control and monitoring of Adana shopping center project

Download
1999
Erkan, Ziya Kerim

Suggestions

Budget deficits, interest rates, public and private investments in Turkey
Saygılı, Hülya; Özmen, Erdal; Department of Economics (1998)
Budget deficits, monetary growth and inflation in Turkey : An empirical investigation
Tekin, Ayça; Özmen, Erdal; Department of Economics (1997)
Cost estimation of trackworks of light rail and metro projects
Öztürk, Erhan; Gündüz, Murat; Department of Civil Engineering (2009)
The main objective of this work is to develop models using multivariable regression and artificial neural network approaches for cost estimation of the construction costs of trackworks of light rail transit and metro projects at the early stages of the construction process in Turkey. These two approaches were applied to a data set of 16 projects by using seventeen parameters available at the early design phase. According to the results of each method, regression analysis estimated the cost of testing sample...
Budget deficits and inflation in Turkey
Şaylan, Tülay; Keyder, Nur; Department of Economics (1988)
Benefit-cost analysis for retrofitting of selected residental buildings in İstanbul
Erdurmuş, Salih Buğra; Erant, Engin; Department of Civil Engineering (2005)
During the evaluation of the seismic retrofitting option for risk reduction/mitigation measures to be applied over buildings, Benefit Cost Analysis is an often-used method. During this study of Benefit Cost Analysis, the condition that the earthquake can happen just after or sometime after retrofitting will be taken into consideration rather than some approaches that focus on the benefits and costs regarding the annual probability of the occurrence for possible earthquakes. The analysis will use conditional...
Citation Formats
Z. K. Erkan, “Budget control and monitoring of Adana shopping center project,” Middle East Technical University, 1999.