Dell'Amico, M., 1996. Shop problems with two machines and time lags. Operations Research 44(5), 777-787.
Dhouib, E., Loukil, T., Teghem, J., 2008. Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with minimal and maximal time lags. In Proceedings 7éme Conférence Internationale de Modélisation, Optimisation et Simulation des systèmes (MOSIM'08), pp. 1057-1066. Editions Tec & Doc Lavoisier, Paris, France.
Fondrevelle, J., Oulamara, A., Portmann, M.-C., 2006. Permutation flowshop scheduling problems with maximal and minimal time lags. Computers and Operations Research 33, 1540-1556.
Fondrevelle, J., Oulamara, A., Portmann, M.-C., 2008. Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion times. International Journal of Production Economics 112, 168-176.
Fondrevelle, J., Oulamara, A., Portmann, M.-C., Allahverdi, A., 2009. Permutation flow shops with exact time lags to minimise maximum lateness. International Journal of Production Research 47(23), 6759-6775.
Glover, F., Kochenberger, G.A., 2003. Handbook of Metaheuristics. Kluwer's International Series Operations Research and Management Science, Dordrecht.
Gupta, J.N.D., Palanimuthu, N., Chen, C-L., 1999. Designing a tabu search algorithm for the two-stage flow shop problem with secondary criterion. Production Planning and Control: An International Journal 10, 251-265.
Gupta, J.N.D., Hennig, K., Werner, F., 2002. Local search heuristics for two-stage flow shop problems with secondary criterion. Computers and Operations Research 29(2), 113-149.
Hariri, A.M.A., Potts, C.N., 1989. A branch and bound algorithm to minimize the number of late jobs in a permutation flowshop. European Journal of Operational Research 38, 228-237.
Joo, B.-J., Kim, Y-D., 2009. A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints. Journal of the Operational Research Society 60(4), 572-582.
Kim, Y.-D., Lim, H.G., Park, M-W., 1996. Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process. European Journal of Operational Research 91, 124-143.
Lenstra, J.K., Rinnooy Kan, A.H.G., Brucker, P., 1977. Complexity of machine scheduling problems. Annals of Discrete Mathematics 1, 343-362.
Manier, M.-A., Bloch, C., 2003. A classification of hoist scheduling problems. International Journal of Flexible Manufacturing Systems 15(1), 37-55.
Nagar, A., Haddock, J., Heragu, S., 1995. Multiple and bicriteria scheduling: A literature survey. European Journal of Operational Research 81, 88-104.
Neppalli, V.R., Chen, C-L., Gupta, J.N.D., 1996. Genetic algorithms for the two-stage bicriteria flowshop problem. European Journal of Operational Research 95, 356-373.
Rajendran, C., 1992. Two stage flowshop scheduling problem with bicriteria. Journal of Operational Research Society 43, 871-884.
Teghem, J., Pirlot, M., 2002. Optimisation approchée en recherche opérationnelle. Hermes Science Publications, Paris, France.
T'kindt, V., Billaut, J-C., 2001. Multicriteria scheduling problems: A survey. RAIR/Operations Research 35, 143-163.
T'kindt, V., Gupta, J.N.D., Billaut, J-C., 2003. Two-machine flowshop scheduling with a secondary criterion. Computers and Operations Research 30, 505-526.
Yang, D.L., Chern, M.S., 1995. A two-machine flowshop sequencing problem with limited waiting time constraints. Computers and Industrial Engineering 28(1), 63-70.